GranaSAT BEXUS Team 2013-12-042024-04-19amroldan [calameo code=00300480231ba1a7f450a authid=KFhtQwLC8u8Q width=900 height=583] [...]
Data processing system 2013-12-04amroldan This is the principal part of our experiment. All the peripherals will be connected to it. It will control the digital camera and [...]
Thermal design 2013-12-042024-04-19amroldan This is the system than will be in charge of maintaining our experiment at a constant temperature and will make its functioning possible. [...]
Ground Station Antennas have been deployed 2013-12-032022-12-21amroldan We are pleased to announce that the Ground Station antennas of the GranaSAT-I project have been successfully installed on top of the Science [...]
Antenas de la estación base del GranaSAT 2013-12-032024-04-19amroldan Con la reciente instalación de las antenas, la estación base del GranaSAT estará muy pronto operativa y preparada para contactar con la ISS [...]
Team selected to present the proposal at the European Space Research and Technology Centre, in Noordwijk. 2013-12-022024-04-19amroldan For the first time in the University of Granada, a group of science and engineering students has been selected to present a proposal [...]
Mechanical design 2013-12-022024-04-19amroldan This will be the hardware and protective equipment for our experiment during its expedition to the stratosphere. It consists of two parts: the [...]
Diseño mecánico 2013-12-022024-04-19amroldan Este es nuestro soporte y protección durante la expedición a la estratosfera. Está dividida en dos partes: la caja principal con la CPU, [...]
Despliegue de las antenas 2013-12-022024-04-19amroldan Las antenas de la Estación Terrestre del GranaSAT-I ya se encuentran instaladas en el tejado de la Facultad de Ciencias de la Universidad [...]
Antennas deployment 2013-12-022017-10-21amroldan The Ground Station of the GranaSAT-I is already installed on top of the Faculty of Science of the University of Granada and will [...]